In Development

Project Rail

An immersive Sydney Trains simulator built on Roblox. Experience authentic rolling stock, detailed stations, and realistic signaling networks across the network.

Project Rail Station Project Rail Rolling Stock
GAMEPLAY

Engineered for Realism

Experience an authentic representation of the Sydney Trains passenger network built on high-fidelity simulation mechanics.

Network Signaling

Navigate complex track layouts controlled by realistic automatic and controlled signaling blocks modeled directly on actual network setups.

True Infrastructure

Drive past highly detailed platform designs, accurate station spacing, and functional overhead catenary wiring systems tailored for Roblox.

Advanced Handling

Master authentic rolling stock physics, incorporating realistic acceleration profiles, air braking delays, and passenger load weight variables.

ROLLING STOCK

Project Rail Fleet

Track active development, systems engineering, and exterior detailing progress for upcoming train sets.

Waratah A Set

100%

Extra carriages being placed

Tangara T Set

73%

Chassis frame layout, bogie positioning, and custom traction motor scripting are underway.

Millennium M Set

0%

Initial blueprint mapping and basic exterior cab prototyping have commenced.

CHANGELOG

Developer Patch Notes

Stay up to date with the latest engine updates, network expansions, and system optimizations rolled out by the development team.

IMPORTANT NOTICE June 2026

Development Transferred to Trackline Studios!

Please note that we are no longer updating or managing Project Rail on this personal profile. We have officially transferred development operations over to our dedicated group entity: Trackline Studios!

Don't worry—absolutely nothing is changing regarding the game itself. The exact same team is still engineering the project, just under our organized studio account. Everything continues business as usual under the new group setup!

v0.4.2 Update June 2026

Waratah Finalization & Signal Alpha Test

This cycle brings major milestones for rolling stock deployment and backend signaling mechanics:

  • Fleet Completion: The Waratah A Set is now 100% physically modeled with fixed formations compiled.
  • System Integration: Introduced multi-modal technical specification arrays to track structural data.
  • Signaling Infrastructure: Initial prototyping for controlled and automatic signaling blocks has begun.
v0.3.0 Update May 2026

Tangara Framework & Track Layouts

Focused heavily on heavy physics configurations and spatial geometry across station platforms:

  • Tangara T Set: Completed 73% of chassis frame modeling, bogie placement, and torque scripting.
  • Track Layouts: Fixed geometry collision errors on curves to handle realistic passenger loads smoothly.